Wisbrüggli **
Küsnacht ZH (ZH)
Construction type | Iron Carrier |
---|---|
Construction shape | Iron Carrier |
Obstacle | Wagnerbach (Running waters) |
Coordinates | 690316 / 241983 |
Altitude | 607m |
Max. load | 0.5t |
Length | 6.4m |
Usable width | 1.4m |
In charge | Gemeinde Küsnacht ZH |
Deck coatings | Planks across |
Facade coating | Railing |
Restrictions | General ban |
ID | 1381 |
Remark [de]
Gesandt von Ernst Spiess
Bridge visited or documented in 2011