Hilfsbrücke **
Boningen (AG)
Construction type | Open Bridge |
---|---|
Construction shape | Iron Carrier |
Obstacle | Strasse (Street) |
Coordinates | 631576 / 239679 |
Altitude | 412m |
Built | 2012 |
Max. load | 1.5t |
Length | 42.0m |
Usable width | 3.0m |
In charge | Gemeinde Boningen |
Access | Pedestrian, Cycling |
Supports | Pillar-thinning |
Deck coatings | Planks across |
Facade coating | Railing |
Restrictions | General ban |
ID | 1573 |
Bridge visited or documented in 2012