Tierpark Lange Erlen ***
Basel (BS)
Construction type | Open Bridge |
---|---|
Construction shape | Bar |
Obstacle | Weier (Still waters) |
Coordinates | 612675 / 269270 |
Altitude | 253m |
Built | 2009 |
Max. load | 0.5t |
In charge | Tierpark Lange Erlen, Baselstadt |
Access | Pedestrian |
Supports | Concrete pillar |
Deck coatings | Planks across |
Facade coating | Railing |
Restrictions | General ban |
ID | 185 |
Bridge visited or documented in 2009